QUBE Distribution Centre
![QUBE Distribution Centre](https://dms.sencova.com//_image/media/40/qube-distribution-centre.jpg)
Completed:
January 2015Surface Area:
351.5 tonnesLocation:
Darwin, Northern Territory17 truck loads - 351.5 tonnes of fabricated steel was transported from our Brisbane workshop to a Darwin galvanisers for the QUBE facility in Hudson Creek, Northern Territory. All completed and on site in the programmed timeframe.